The use of different objectives provides a broad set of noninferior design solutions to the engineer in order to make the final selection when compared to the single-objective-construction costs-formulation, where the minimum cost solution is directly provided by the optimization algorithm. Improved results are obtained when compared to the traditional approach based on a standardized tower-by-tower design. The method allows us to determine the trade-offs (Pareto front) between the outage rate of the transmission line and the investment costs of adding insulation or reducing grounding impedance at each tower. This paper proposes a new multiple-objective optimization formulation to solve the problem of outage rate reduction of electric transmission lines due to back-flashover phenomena from technical and economical viewpoint. ![]() ![]() ![]() The improvement of reliability indexes as the energy not supplied is a major issue in electricity markets.